Rock Tech Lithium announced on November 16, 2026, that it had found a new outcrop of spodumene-bearing pegmatite at Victory, its lithium exploration project in northwestern Ontario, Canada. The discovery lies about 10 km east of the known Bounty occurrence, and it extends the company's known lithium trend from about 6 km to about 16 km. The find adds candidate sites for the first drilling, which will test the subsurface. However, turning it into additional payments under the property option agreement, or into a feedstock supply for the planned lithium conversion plant, will require work to establish the subsurface resource, its grade and how well the ore can be processed.

AD

New outcrop found about 10 km east of Bounty

In its first field program, Rock Tech Lithium focused on Last Resort and Bounty, which are about 6 km apart, on the little-explored ground between them, and on the directions in which the known rock bodies extend. When it announced the program in October, neither of the two known occurrences had been drilled, and the company was carrying out surface sampling and geological surveys. It was mapping outcrop locations, geological structures and the trends of the pegmatites, and using geological interpretation to rank candidate drill sites. During that work, the company says, it found a third lithium occurrence east of Bounty.

The new outcrop extends about 150 meters along strike and at least 60 meters across. These are, however, the dimensions of the exposed surface. The figure of about 16 km is likewise the extent over which known occurrences are distributed, and it does not confirm that the rock bodies are continuous underground between those points. In a surface survey the company published in June, the Last Resort outcrop was about 200 meters along strike and up to about 30 meters wide, while Bounty was about 375 meters along strike and up to about 60 meters wide. Based on such surface observations, the company will narrow down the drilling locations at which to confirm the underground rock bodies.

Grade analysis and the 2027 drilling plan

Rock Tech Lithium reports that it visually confirmed the lithium-bearing mineral spodumene over a wide area of the new outcrop, and that it used a handheld laser-induced breakdown spectroscopy (LIBS) device to detect lithium in selected crystals. Rock samples collected in the field have been submitted to Activation Laboratories (Actlabs) in Thunder Bay. The laboratory will measure the lithium content of the rock and report grades converted to lithium oxide (Li₂O). The company plans to use the results to understand grade variation within the outcrop and to help design its drilling program. It will also analyze elements other than lithium to examine how the rock's chemistry changed as it formed, which could point to additional exploration targets.

Last Resort and Bounty also have analytical data from rock samples collected in the past. Selected samples reached up to 5.11% lithium oxide at Last Resort and up to 3.48% at Bounty. However, these are historical values that Rock Tech Lithium had not fully verified as of October, and the highest values from specially selected rock samples cannot be treated as the average grade of the whole deposit.

Drilling is needed to confirm the shape of the underground rock bodies and their true thickness, measured perpendicular to their boundaries. By comparing samples from drilling at multiple locations, geologists can assess how lithium grades are distributed underground and how far they continue. Under the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) definition standards, a mineral resource estimate requires geological evidence supporting tonnage and grade, as well as reasonable prospects for eventual economic extraction. A mineral reserve, by contrast, is the part of a mineral resource of a certain confidence level that studies on mining methods, processing conditions and other factors have shown to be economically mineable.

AD

The option agreement and mineral resources

Under agreements with Bounty Gold and Last Resort Resources, Rock Tech Lithium holds an option to acquire 100% of the Victory project in exchange for cash and its own common shares. According to the company's announcements, the sequence from the June 2026 agreement to the first drilling planned for 2027 is as follows.

Date Stage of agreement / exploration Source
June 17, 2026 Option agreement signed to acquire the property interest; announced on June 22 Agreement terms
October 22, 2026 First field program announced; survey of the two known occurrences and the ground between and beyond them Field program announcement
November 16, 2026 New outcrop discovery announced; rock samples submitted to a laboratory, with results pending New outcrop announcement
2027 First drilling planned Stated in the November 16 announcement

The consideration for the interest is a total of C$600,000 in cash and C$400,000 in Rock Tech Lithium common shares, paid in stages over 24 months. C$150,000 in cash and C$100,000 in shares were paid on signing, and the remainder is payable in installments at 12 and 24 months after signing. Separately from these acquisition payments, the agreement provides for additional payments tied to the announcement of mineral resources. The outcrop discovery expands the candidate drill sites, but it does not satisfy the conditions for the resource-linked payments.

According to the terms published in June, the additional payment tied to an initial mineral resource estimate is C$500,000. It is triggered if the company publishes an initial estimate compliant with Canada's NI 43-101 mining disclosure standard showing a mineral resource of at least 10 million tonnes at a grade of at least 1.0% lithium oxide. The agreement also includes other additional payments tied to the announcement of specific categories of mineral resource. As of its June announcement, Rock Tech Lithium had estimated neither a mineral resource nor a mineral reserve for Victory.

Conditions for supplying the Red Rock conversion plant

Rock Tech Lithium positions Victory as part of its lithium feedstock sourcing plan in Ontario, which is centered on Georgia Lake. It intends to consider Victory as a candidate to supply additional feedstock to its planned Red Rock lithium conversion plant. The Victory exploration area lies about 45 km east of Kenora and covers 9,875 hectares. It is about a five-hour drive from the planned Red Rock plant site, lies along the Trans-Canada Highway and has a railway nearby. These are factors to weigh when considering future feedstock transport.

However, judging whether the ore can serve as feedstock for the conversion plant will require processing tests to confirm lithium recovery, along with an assessment of mining methods, processing steps and costs. Rock Tech Lithium says it will advance further exploration, technical studies and ore processing tests, and will also consider processing the ore away from the Victory site. To firm up supply to Red Rock, the company will need to determine where and how ore mined at Victory could be processed to obtain lithium feedstock economically.