
50MW-Class Floating Data Center: Samsung Heavy and Mousterian Move to Pre-EPC Design
Samsung Heavy Industries and Mousterian have shifted to a contract covering basic design and other work for a floating data center in Texas. The 500MW plan and the 50MW-class design are distinct, and ERCOT's audit process must also be checked for grid-connected projects.








